PROJECT NAME
Civil Work to Lighting Of 30 June Axis
LOCATION
YEAR
March 2019
President Abdel Fattah El-Sisi witnessed the opening of the 30 June axis with a length of 210 km, parallel to the Suez Canal. It is one of the mega national projects that the state is inaugurating during the recent period within the comprehensive development plan.
More About 30 June Axis
Projects make our history
It includes a number of industrial works and includes 6 vertical bridges on the axis, 14 main bridges in the direction of the axis, 24 pedestrian and cars tunnels, 2 pedestrian tunnels, 400 solar lighting columns on bridges, and 2 points to secure the road. The role of the axis has roles at the national and local levels.